Wastewater treatment plant AT 750 oval thermal swimming pool.

The WWTP ensures the cleaning of sewage waste water produced from the thermal swimming pool in the village of Diakovce, as it is not possible to connect to the public sewer system in the area.
 
Mechanically pre-treated wastewater drains by gravity into the equalization tank and is pushed from there by sludge pumps into the three biological reactors of the wastewater treatment plant for 750 PE. Biologically purified waters are discharged into the recipient.
 
Capacity and technological parameters:
Technical parameters of WWTP AT 750 oval (3x250 oval):
Number of reactors: 3
Reactor length: 13400 mm
Reactor width: 2260 mm
Reactor height: 2500 mm
Daily flow: 113.0 m³/d
Load: 45 kg BOD5 /d