Sewage treatment plant AT 250 oval highway rest stop.
The WWTP ensures the cleaning of sewage waste water produced at the highway rest stop, including the cafe and restaurant.
Wastewater flows by gravity to the pumping station with mechanical pre-treatment, from where it is pumped into the biological reactor of the wastewater treatment plant for 250 PE and then to the tertiary treatment of ATF.
Cleaned waters are discharged into the recipient.
Capacity and technological parameters:
Technical parameters of AT 250 oval sewage treatment plant
Reactor length: 13460 mm
Reactor height: 2500 mm
Reactor width: 2260 mm
Daily flow: 37.5 m³/d
Load: 15.0 kg BOD /d