Waste water treatment plant AT 175 oval for social services center.

The WWTP ensures the cleaning of sewage waste water from the Social Services Center in the village of Habura, as it is not possible to connect to the public sewer system in the area. Wastewater flows by gravity to the pumping station, from where it is pumped by a sludge pump into the biological reactor of the treatment plant for 175 PE.
Cleaned waters are discharged into the recipient.
 
Capacity and technological parameters:
Technical parameters of AT 175 oval sewage treatment plant
Reactor length: 9,760 mm
Reactor width: 2,260 mm
Reactor height: 2,500 mm
Daily flow: 26.25 m³/d
Load: 10.5 kg BOD5 /d