Waste water treatment plant AT 200 oval
The WWTP ensures the cleaning of sewage waste water from constructions - an elementary school with a kindergarten, from 3 apartment buildings and 1 family house in the village of Mikušovce, since there is no public sewage system in the area. Wastewater flows by gravity to the pumping station, from where it is pumped by a sludge pump into the biological reactor of the treatment plant for 200 EO.
Cleaned waters are discharged into the recipient.
Capacity and technological parameters:
Technical parameters of AT 200 oval WWTP
Reactor length: 10960 mm
Reactor height: 2500 mm
Reactor width: 2260 mm
Daily flow: 30.00 m³/d
Load: 12.0 kg BOD5 /d