WWTP AT 2000 oval Maxi (4x AT 500 Maxi oval)
The WWTP ensures the treatment of sewage waste water from individual residential construction (IBV) in the village of Alekšince, as it is not possible to connect to the public sewer system in the area. Gravitationally inflowing sewage wastewater will be treated in a mechanical-biological WWTP with a tertiary level of treatment.
The WWTP will be expanded in stages according to the ongoing construction of family houses, terraced apartment buildings and civic amenities.
In the first stage, the capacity of the biological part of the WWTP was built for 500 PE, and at the same time, the complete infrastructure of the WWTP was built for all other stages: inlet pumping station, mechanical pre-treatment, sludge management, tertiary treatment. Cleaned wastewater will be discharged into the recipient.
Capacity and technological parameters:
Technical parameters of AT 2000 Oval Maxi (4x AT 500 Maxi Oval)
Number of reactors: 4
Daily flow: 300 m³/d
Load: 120 kg BOD5 /d
Number of reactors, stage I: 1
Reactor length: 13660 mm
Reactor width: 3000 mm
Reactor height: 3400 mm